• Link to LinkedIn
  • Link to Instagram
  • Link to Youtube
  • mail@kalzip.com
  • German
  • English
  • English (US)
  • Deutsch Deutsch German de
  • English English English en
  • English (US) English (US) English (US) us
  • Français Français French fr
  • Italiano Italiano Italian it
  • Español Español Spanish es
  • Русский Русский Russian ru
Tel.: +1 219 286 3481
Kalzip GmbH
  • About us
    • About Kalzip
    • History
    • Sustainability
    • Donges Group
    • Management
  • Roof systems
    • Our roof systems

      • Deck roof system
      • Energy-saving roof
      • Vented roof systems
      • Roof refurbishment
      • Solar roof
      • Nature roof system
      • Overclad roofing systems
      • Complex geometry roof system
      • Standing seam roof

      • Aluminium roof profiles
      • Downloads
      • Roof system accessories
  • Façade systems
    • Our façade systems

      • Sheet metal façade
      • Profiled façade
      • Standing seam façade
      • Rainscreen façade
      • Facade refurbishment
      • Façade Design

      • Aluminium façade profiles
      • Downloads
  • Sustainability
  • References
    • 55 Years Book
    • Kalzip and the Louisiana Superdome – Reimagining an icon
  • Downloads
  • Service
  • News
  • Contact
  • Click to open the search input field Click to open the search input field Search
  • Menu Menu
  • Deutsche Version
  • UK Version
  • Version française
  • Versione italiana
  • Русская версия
  • Home
  • About us
    • About Kalzip
    • History
    • Sustainability
    • Donges Group
    • Management
  • Roof systems
    • Deck roof system
    • Energy-saving roof
    • Vented roof systems
    • Roof refurbishment
    • Solar roof
    • Nature roof system
    • Overclad roofing systems
    • Complex geometry roof system
    • Standing seam roof
    • Aluminium roof profiles
    • Roof system accessories
  • Façade systems
    • Sheet metal façade
    • Profiled façade
    • Standing seam façade
    • Rainscreen façade
  • References
  • Downloads
  • Service
  • News
  • Contact
    • +1 219 286 3481
    • mail@kalzip.com
    • Our Contacts
    • Privacy policy
    • Disclaimer

Alexander Stadium in Birmingham

30. October 2023/in News, Project of the month, Projects/by Kalzip GmbH News

KALZIP HELPS TO REGENERATE STADIUM IN TIME FOR COMMONWEALTH GAMES

The enormous regeneration of Alexander Stadium in Birmingham was commissioned by Birmingham City Council, with a requirement for work to be complete in time for the Commonwealth Games in the summer of 2022. A range of products from Kalzip’s extensive range was specified for the project, which involved the construction of a new ‘West Stand’ along with construction of new North and South Bowl seating which increases the overall capacity from 12,700 to 18,000.

Planned down to the smallest detail

The Kalzip FC Cladding was specified for the fascia which extended to the full perimeter of the stadium roof. However, this posed a particular problem as the system isn’t designed to follow a fan shaped elevation when fitting the FC panels vertically. Therefore, a transition detail had to be developed in conjunction with Kalzip’s expert design department, in order to introduce bespoke transition panels at each grid line. This refined the orientation of the line to allow the next bank of panels to be installed correctly onto the subsequent bay.

An adjustable sub-structure was used to create the curve of the roof on to the flat decking. The Kalzip Deck Roof System was used to cover the roof. With this roofing system, a variation of geometries are possible, while also offering quick installation and durability against any weather conditions. Overall, 5,530 m² of Kalzip standing seam profiled sheets were installed on the roof and 830 m² of FC panels cover the facade.

 

A stadium not without its challenges

There were a number of challenges to overcome in order to complete Alexander Stadium, including working in line with strict COVID restrictions, so collaboration with all parties was key. Care was taken to ensure that everyone working on the project were able to adapt to the new working systems in order to prevent any drop in efficiency.

John McAllister from Kalzip said: “Due to the pandemic, the general availability of construction materials was more difficult than usual, with reduced availability and an increase in prices. As a result of Kalzip’s long-standing relationships with key primary international producers, we were able to navigate around the issue of material availability with a minimum of disruption, and also assist in keeping things on track and within budget for the client.

“Some of the standing seam panels used on Alexander Stadium measured over 40m in length, which certainly created some issues for us in terms of transportation and movement. The expertise of the team was essential for this, and careful planning was required to ensure that these panels were lifted onto the roof area safely and efficiently. A crane was used to transport the panels, and this ensured that no time was lost.

“Due to the dynamic shape of the stadium and the unique curvature of the roof, each halter clip needed to be set in its own specific position which required a high level of accuracy and attentional to detail. The setting out of halter clips was a meticulous, yet crucial job to the overall finish of the stadium’s roof.”

The Mayor of the West Midlands, Andy Street, who chairs the WMCA said: “It was fantastic to see the regeneration of the Alexander sporting arena, of which the whole region can be proud of, and one fit to host the world’s leading athletes for years to come. But far more importantly the construction works on the stadium played a major role for people’s livelihoods by supporting vital construction jobs and apprenticeships both on site and in the wider business supply chain.”

 

A project that supported local communities

The overall result was the successful completion of a prestigious project, ultimately the construction provided one of the very best sports stadiums in the country, which played host to the Commonwealth Games. This project also involved the You Matter Communities Scheme, providing local communities and people with an opportunity to access small grants, volunteer time and unused materials from the construction process.

Construction and installation of the World Athletics Class 1 facility, including a new 400m six lane warm up track, the relaying of a new 400m, nine lane competition standard track, formation of a practice throwing field, stadium lighting and various associated highway and infrastructure works were also completed as part of the wider project.

Considered with care. KALZIP.

Contace

Kalzip GmbH
Yannick de Beauregard
Kalzip Marketing
August-Horch-Str. 20 – 22
56070 Koblenz

Phone: +49 261 9834 0
Fax: +49 261 9834 100

E-Mail: yannick.de-beauregard@kalzip.com

Share this entry
  • Share on Facebook
  • Share on X
  • Share on LinkedIn
  • Share by Mail
https://www.kalzip.com/wp-content/uploads/2023/10/Gross-DJI_0937.jpeg 959 1280 Kalzip GmbH News https://www.kalzip.com/wp-content/uploads/2023/08/Kalzip_rot_schwarz.png Kalzip GmbH News2023-10-30 11:00:542024-10-27 07:39:18Alexander Stadium in Birmingham

Search

Search Search
  • Construction site of the week – Calton Village, Glasgow16. May 2025 - 7:50 am
  • Construction site oft he week – Stadion FC Lugano, Tessin12. May 2025 - 11:26 am
  • Construction site of the week – Collège d’Osny, France2. May 2025 - 11:08 am
  • Construction site of the week – Disneyland Paris18. April 2025 - 10:56 am
  • Project of the month: In the high arch: New Annen Plus factory building16. April 2025 - 7:21 am
  • Kalzip strengthens relations with Kazakhstan: successful meeting with high-ranking representatives15. April 2025 - 9:15 am
  • Construction site of the week – Helmholtz Institute, Münster11. April 2025 - 10:43 am
  • Construction site oft he week – Kelvin Hall, Glasgow4. April 2025 - 9:50 am
  • Construction site of the week – Blairgowrie Recreation Centre, Blairgowrie, Scotland21. March 2025 - 9:12 am
  • Project of the month: Kindergarten Lütjensee: A roof over the children’s laughter19. March 2025 - 8:04 am

About us

Über uns

  • About Kalzip
  • History
  • Donges Group
  • Management

Products

Produktpalette

  • Products
  • Roof systems
  • Façade systems

Downloads

Downloads

  • Downloads
  • Service

Contact

Kontakt

  • Make an enquiry
  • International contacts
  • Directions to Kalzip

Copyright © 2025 | Kalzip® GmbH
  • Link to LinkedIn
  • Link to Instagram
  • Link to Youtube
  • Terms and conditions
  • Disclaimer
  • Privacy policy
Link to: Museum Lausanne Link to: Museum Lausanne Museum Lausanne Link to: Brewery “De Halve Maan” in Bruges, Belgium Link to: Brewery “De Halve Maan” in Bruges, Belgium De Halve Maan brewery in Bruges (Belgium)Brewery “De Halve Maan” in Bruges, Belgium
Scroll to top Scroll to top Scroll to top
Privacy & Cookies
We are using cookies to give you the best possible experience on our website. Some of them are essential to display the website, while others help us to improve this website and your experience. You can consent to the use of cookies (except for functional cookies), your consent is voluntary and can be withdrawn at any time with future effect. For more information, please see our privacy policy.
Individual settings Accept allReject all
Cookies

Data protection overview

We are using cookies to give you the best possible experience on our website. Some of them are essential to display the website, while others help us to improve this website and your experience. You can consent to the use of cookies (except for functional cookies), your consent is voluntary and can be withdrawn at any time with future effect. For more information, please see our privacy policy or the imprint.
Functional
Always Enabled

Functional cookies are absolutely necessary for the proper functioning of the website. This category only includes cookies that ensure basic functionalities and security features of the website. These cookies do not store any personal information.

Marketing

Marketing cookies are used to provide visitors with relevant ads and marketing campaigns. These cookies track visitors across websites and collect information to provide customised ads.

Statistics

Statistical cookies are used to understand how visitors interact with the website. These cookies help provide information about metrics such as number of visitors, bounce rate, source of traffic, etc.

Save & Accept

Searching for a Zinc alternative?

We have the perfect solution for you!

FalZinc is not just another building material; it’s a revolutionary aluminum solution with a zinc surface that beautifully merges form with function. Its lightweight nature significantly reduces structural load, making it an ideal choice for a wide range of applications.

Click here and get your samples for free to see whats possible!

Get your free samples now!


  • ←
  • News
  • Downloads
  • Contact
  • Sustainability