• Link to LinkedIn
  • Link to Instagram
  • Link to Youtube
  • mail@kalzip.com
  • German
  • English
  • English (US-CA)
  • French
  • Italian
  • Spanish
  • Russian
  • Deutsch Deutsch German de
  • English English English en
  • English (US-CA) English (US-CA) English (US-CA) us
  • Français Français French fr
  • Italiano Italiano Italian it
  • Español Español Spanish es
  • Русский Русский Russian ru
Tel.: +1 219 286 3481
Kalzip GmbH
  • Inspiration
  • About us
    • About Kalzip
    • History
    • Sustainability
    • Donges Group
    • Management
    • News
  • Roof systems
    • Our roof systems

      • Deck roof system
      • Energy-saving roof
      • Vented roof systems
      • Roof refurbishment
      • Solar roof
      • Nature roof system
      • Overclad roofing systems
      • Complex geometry roof system
      • Standing seam roof

      • Aluminium roof profiles
      • Downloads
      • Roof system accessories
      • Solar roof accessories
  • Façade systems
    • Our façade systems

      • Sheet metal façade
      • Profiled façade
      • Folded façade
      • Standing seam façade
      • Rainscreen façade
      • Ball Proof façade
      • Facade refurbishment
      • Façade Design

      • Aluminium façade profiles
      • Downloads
  • Sustainability
  • References
    • Lighthouse
    • 55 Years Book
    • Kalzip and the Louisiana Superdome – Reimagining an icon
  • Downloads
  • Service
  • Contact
  • Click to open the search input field Click to open the search input field Search
  • Menu Menu
  • Deutsche Version
  • UK Version
  • Version française
  • Versione italiana
  • Русская версия
  • Home
  • About us
    • About Kalzip
    • History
    • Sustainability
    • Donges Group
    • Management
  • Roof systems
    • Deck roof system
    • Energy-saving roof
    • Vented roof systems
    • Roof refurbishment
    • Solar roof
    • Nature roof system
    • Overclad roofing systems
    • Complex geometry roof system
    • Standing seam roof
    • Aluminium roof profiles
    • Roof system accessories
  • Façade systems
    • Sheet metal façade
    • Profiled façade
    • Standing seam façade
    • Rainscreen façade
  • References
  • Downloads
  • Service
  • News
  • Contact
    • +1 219 286 3481
    • mail@kalzip.com
    • Our Contacts
    • Privacy policy
    • Disclaimer

New canteen for Schwalben primary school in Wriedel, Germany

8. May 2023/in News, Project of the month, Projects/by Kalzip GmbH News

A new cafeteria for the Swallow Elementary School in Wriedel

In order to meet the requirements for mandatory all-day care, the Swallow Elementary School in Wriedel, near Hamburg, has received a new cafeteria for lunchtime meals. The modern, one-story building is covered with an aluminum gable roof and has an integrated solar system that provides the school with sustainably generated electricity. Interested visitors, teachers, and students can use a monitor to learn about the system’s performance.

The cafeteria plays a central role in the open all-day school operation, not only because students need to be fed, but also because it is intended as a space for community building, says school principal Sabine Liebmann. “The cafeteria is not only used for eating, but also as a meeting room. It replaces the auditorium that we didn’t have,” says Liebmann.

Bright and educational

Skylights were installed on the roof as a natural source of light so that daylight can enter the room at any time. The over 300 square meter roof area is covered with photovoltaic modules, which fill most of the aluminum profile panels to maximize the potential of the overall area.

The aluminum standing seam roof with photovoltaic system was constructed using the tried and tested AluPlusSolar system from Kalzip and consists of individually prefabricated aluminum profile panels. The very flat solar panels are already glued to the profiles in the factory to avoid any impact on the connection due to dust, dirt or moisture and to facilitate installation for skilled tradesmen. The Kalzip 50/444 profile used for the interconnection is known for its weather resistance and durability.

 

Efficient, robust and sustainable despite minimal weight

The skilled tradesmen first installed the system-specific composite clips on the slightly sloping roof area, which was provided with a vapor barrier. This was followed by a mineral thermal insulation layer to efficiently and sustainably insulate the building. Since the module connections are located behind the panels, each panel had to be placed individually on the standing seam of the previous panel.

The aluminum standing seam roof with photovoltaic utilization impresses with its lightweight design and high energy efficiency, as it weighs significantly less than other roofing systems and has therefore already proven to be the system of choice in many previous construction projects. Overall, around 100 students now attend the new cafeteria and enjoy events in their new auditorium.

 

Considered with care. KALZIP.

Contact

Kalzip GmbH
Yannick de Beauregard
Kalzip Marketing
August-Horch-Str. 20 – 22
56070 Koblenz

Phone: +49 261 9834 0
Fax: +49 261 9834 100

E-Mail: yannick.de-beauregard@kalzip.com

https://www.kalzip.com/wp-content/uploads/2023/05/Gross-Grundschule-Wriedel-002.jpeg 853 1280 Kalzip GmbH News https://www.kalzip.com/wp-content/uploads/2023/08/Kalzip_rot_schwarz.png Kalzip GmbH News2023-05-08 11:00:432024-10-27 07:50:29New canteen for Schwalben primary school in Wriedel, Germany

Cal Poly Pomona Student Services Building

19. April 2023/in Architecture, News, Projects/by Kalzip GmbH News
Read more
https://www.kalzip.com/wp-content/uploads/2023/04/Pomona-CalPoly-Hoch.jpg 1920 1220 Kalzip GmbH News https://www.kalzip.com/wp-content/uploads/2023/08/Kalzip_rot_schwarz.png Kalzip GmbH News2023-04-19 08:15:442024-10-27 07:33:25Cal Poly Pomona Student Services Building

New Wintringham Primary School Academy in St Neots

11. April 2023/in Architecture, News, Project of the month, Projects/by Kalzip GmbH News

A COMBINATION OF HIGH PERFORMANCE AND DISTINCTIVE ARCHITECTURE – THE AVOCADO SCHOOL BUILDING EXCELS

The township of Wintringham received a new flagship building in the form of Wintringham Primary Academy in St Neots, Cambridgeshire, completed in 2021. Cambridgeshire County Council commissioned the building affectionately known as the ‘Avocado’ due to its unique roof shape. The project is a clear demonstration of the excellence of workmanship that Kalzip provide to clients through the installation of the Kalzip standing seam roof system and the quality of the bespoke curved aluminium soffit and aluminium fabrications.


Philip Marsh, Founding Director at dRMM (de Rijke Marsh Morgan Architects), who was responsible for the school’s design, said: “Wintringham Primary Academy’s distinctive shape was formed by Passivhaus principles. By arranging teaching spaces around a central grove, the aim was to increase daylighting and cross ventilation from multiple aspects. The shape allows a spatial arrangement which supports the idea of a school ‘in the round’.

“The client required a roof system that was robust and low maintenance, and one that would stand the test of time. A Kalzip standing seam profile roof was selected after considering a few options, ultimately the Kalzip system provided the best option in terms of durability. Additionally, the Kalzip roof also offered compatible bolt-on solutions for roof maintenance systems that were easy to integrate. The project required a fall restraint mansafe system and roof access stair which could be simply incorporated as part of the roof system. From the moment we started liaising with Kalzip for their technical input they were most helpful and were able to answer all our technical queries in great detail.

“Kalzip 50/429, stucco embossed aluminium was specified for the project, which was site rolled at the eaves with the longest sheet measuring 72 metres. Additionally, intricate detail work was required on the curved aluminium fabrications, along with the drainage requirements on the complex roof shape. Having received high-level technical information at the early stages of enquiry, we were confident Kalzip’s experience would be beneficial. We also specified 280mm Kalzip insulation plus 40, compressed to 255mm within a cavity created by E180 clips, S5 & S10 spacer pads, galvanized steel top hat supports fastened down to a Glulam Beam timber structure to achieve the thermal requirements.”

There were some logistical challenges for this bespoke project, mostly surrounding the tight budget and construction programme. Just 12 months were allowed for the construction with completion to coincide with the start of the new school year. Kalzip’s systems are predominantly manufactured offsite, which led to a quick and simple installation onsite, despite the complex nature of the roof.

Wintringham Primary Academy is a prototype typology for an all-timber school that delivers an inspirational learning environment, which surrounds itself with greenery inside and out. To enhance wellbeing, dRMM prioritised a timber aesthetic, natural light, ventilation and direct access to the surrounding landscape in response to the school’s affinity with forest school principles.

As part of a team headed by contractor Morgan Sindall, dRMM worked with Cambridgeshire County Council (CCC) and the Diamond Learning Partnership Trust (DLPT) to develop the vision. This called for a three-form entry primary school for up to 708 children, including a nursery that could be run independently if required. The 3615m2 school was completed in 2021 after a construction programme of just 14 months despite the restrictions of the pandemic.

There were a number of challenges to overcome, and Kalzip’s vast experience was certainly required at numerous points. As a result, Kalzip was awarded Morgan Sindall’s ‘Perfect Delivery” award for the Wintringham Primary Academy project. Wintringham also achieved the RIBA East Regional Award and the RIBA East Sustainability Award in 2022 and was highly commended in the Structural Timber Awards.


For more information please visit: www.kalzip.com/en/

Considered with care. KALZIP.

Contact

Kalzip GmbH
Yannick de Beauregard
Kalzip Marketing
August Horch St. 20 – 22
56070 Koblenz

Phone: +49 261 9834 0
Fax: +49 261 9834 100

E-mail: yannick.de-beauregard@kalzip.com

https://www.kalzip.com/wp-content/uploads/2023/01/KGM_Wintringham-Primary-School_St-Neots_26102020-1.jpg 768 1153 Kalzip GmbH News https://www.kalzip.com/wp-content/uploads/2023/08/Kalzip_rot_schwarz.png Kalzip GmbH News2023-04-11 03:55:552024-03-18 10:20:23New Wintringham Primary School Academy in St Neots

The Boulevard Club, Toronto

23. March 2023/in Architecture, News, Projects/by Kalzip GmbH News
Read more
https://www.kalzip.com/wp-content/uploads/2023/03/150920_1570_2520.jpg 1800 1200 Kalzip GmbH News https://www.kalzip.com/wp-content/uploads/2023/08/Kalzip_rot_schwarz.png Kalzip GmbH News2023-03-23 15:25:082024-03-18 10:20:34The Boulevard Club, Toronto

KALZIP – „Hangar for airship Theo in Mülheim an der Ruhr“

13. March 2023/in News, Project of the month, Projects/by Agentur-EUW
A Hangar for Theo

Retirement is the gold standard for “Theo” the airship.

The airship “Theo” is considered the unofficial mascot of the Ruhr area, as this airship circled above the Ruhr metropolises for almost 50 years. In 2024, the moving landmark will retire. To ensure that “Theo” feels comfortable on the ground in the future, its old hangar has been enlarged, renovated, modernized, and raised to the latest ecological standard. The new, climate-neutral multifunctional hangar can now be used as a venue for 1500 people, surpasses all structural and static requirements with minimal maintenance effort, and is incomparably durable.

Indeed, it sounds like a Kalzip project. The fact that Kalzip was able to meet this unusual challenge was made possible by an expert committee of the International Association for Metal Construction, which recommended that only a building envelope made of 95% recycled aluminium standing seam profiles could meet the extensive climate neutrality requirements of the building concept. This called for a climate-neutral building that meets the Gold Standard requirements of the Society for Sustainable Building. But those who know Kalzip know that it is precisely this type of challenge that drives the company.

 

A 6,500 m2 custom-made structure made of 557,000 kilos of wood and 1,500 wood components.

Since the supporting structure of the new hangar consisted exclusively of wood, no cornerstone was laid in 2022, but a “foundation wood-laying.” The term fits well because a total of 557t of wood from domestic forests was used as a sustainable and renewable building material for the supporting structure. The special feature of this spectacular supporting structure is that a total of 592 nodes were joined together in the main load-bearing areas without a single piece of steel in a truss span of 42m. This required not only tremendous physical effort and extensive construction practical experience from a well-rehearsed team of specialists but also countless work steps at 6500 m2.

A total of around 1500 wood components were manufactured and assembled with millimetre precision. A prerequisite for the professional and efficient installation of the profile sheets at lofty heights was not only the demanding three-dimensional planning and produced the tapered profiled and curved aluminium profiles in advance, but also the precise installation of all fastening elements, both in the elongated, simply curved area and at the quarter-sphere, three-dimensionally shaped hall endings. Due to the dome-shaped form of the new hangar, it was not possible to erect scaffolding, so the aluminium sheets had to be mounted at lofty heights using mobile work platforms. This required individual protective clothing, a safety harness, and a safety net for fall protection.

One system, many solutions.

The complex ecological requirements and the special building geometry require a flexible system that can cope with all challenges and adapt to them. The substructure system FlexiCon RR80 from Kalzip exceeds these requirements. In combination with the installed aluminium standing seam profile, it compensates for existing height differences in the load-bearing surface and also guarantees efficient installation because the installation of the aluminium profile sheets and their insulation is carried out in one work step. To ensure a distortion-free, temperature-related expansion movement of the profile sheets, the clip of the standing seam profile was aligned three-dimensionally during installation on the saddle.

The system developed by Kalzip is also used in dome roofs, flue towers, or other three-dimensional buildings. The FlexiCon system allows the aluminium sheets to be mounted horizontally and vertically with uniform rounding. An important visual feature of the airship hangar. Another advantage of the composite clip system used is that no thermal bridges occur, which would impair the energy efficiency of the building.

 

From beginning to end, a green thread

Theo is proud of the eco-friendliness of his new multifunctional hangar. At the beginning of the construction work, 8000m3 of excavation material was crushed on site and reused as the foundation for the project. The targeted use of resource-saving materials and the reuse of building materials saved a total of over 156t of CO2. The two 400m2 large and 72t (without aluminium cover) heavy door wings are powered by four 80PS electric motors. The aluminium cover can easily be dismantled and added to the recycling cycle after the end of its useful life or it can be reused and repurposed in suitable areas of the building.

Through this future-oriented construction method, it is sustainably ensured that Theo and his visitors of all generations will enjoy his new hangar for many years to come.

Considered with care. KALZIP.

 

Contact

Kalzip GmbH
Yannick de Beauregard
Kalzip Marketing
August Horch St. 20 – 22
56070 Koblenz

Phone: +49 261 9834 0
Fax: +49 261 9834 100

E-mail: yannick.de-beauregard@kalzip.com

https://www.kalzip.com/wp-content/uploads/2023/03/DSC_9470.jpg 1125 2000 Agentur-EUW https://www.kalzip.com/wp-content/uploads/2023/08/Kalzip_rot_schwarz.png Agentur-EUW2023-03-13 11:00:402024-07-13 11:21:47KALZIP – „Hangar for airship Theo in Mülheim an der Ruhr“
Page 3 of 3123

Search

Search Search
  • Highlight of the Month – Lighthouse Church in Heswall11. February 2026 - 9:50 am
  • Construction Site of the Week – Sevens Hotel in Düsseldorf16. January 2026 - 1:20 pm
  • Highlight of the Month – Scheidgen Winery Guest House14. January 2026 - 9:10 am
  • PRESS RELEASE: Kalzip GmbH to Become Part of Tremco Construction Products Group8. January 2026 - 12:54 pm
  • Construction Site of the Week – Westfalenhalle Dortmund17. December 2025 - 12:19 pm
  • Highlight of the Month – EBS University10. December 2025 - 8:21 am
  • Construction site of the week – Hotel with two brands in Uptown Dallas22. November 2025 - 10:33 am
  • Construction site of the week – Estrel Tower, Berlin14. November 2025 - 8:54 am
  • Highlight of the month – Kelloggs Silohotel12. November 2025 - 11:30 am
  • Construction site of the week – Sports halls in Lünen7. November 2025 - 8:39 am

About us

Über uns

  • About Kalzip
  • History
  • Donges Group
  • Management

Products

Produktpalette

  • Products
  • Roof systems
  • Façade systems

Downloads

Downloads

  • Downloads
  • Service

Contact

Kontakt

  • Make an enquiry
  • International contacts
  • Directions to Kalzip

Copyright © 2025 | Kalzip® GmbH
  • Link to LinkedIn
  • Link to Instagram
  • Link to Youtube
  • Terms and conditions
  • Disclaimer
  • Privacy policy
Scroll to top Scroll to top Scroll to top
Privacy & Cookies
We are using cookies to give you the best possible experience on our website. Some of them are essential to display the website, while others help us to improve this website and your experience. You can consent to the use of cookies (except for functional cookies), your consent is voluntary and can be withdrawn at any time with future effect. For more information, please see our privacy policy.
Individual settings Accept allReject all
Cookies

Data protection overview

We are using cookies to give you the best possible experience on our website. Some of them are essential to display the website, while others help us to improve this website and your experience. You can consent to the use of cookies (except for functional cookies), your consent is voluntary and can be withdrawn at any time with future effect. For more information, please see our privacy policy or the imprint.
Functional
Always Enabled

Functional cookies are absolutely necessary for the proper functioning of the website. This category only includes cookies that ensure basic functionalities and security features of the website. These cookies do not store any personal information.

Marketing

Marketing cookies are used to provide visitors with relevant ads and marketing campaigns. These cookies track visitors across websites and collect information to provide customised ads.

Statistics

Statistical cookies are used to understand how visitors interact with the website. These cookies help provide information about metrics such as number of visitors, bounce rate, source of traffic, etc.

Save & Accept

Searching for a Zinc alternative?

We have the perfect solution for you!

FalZinc is not just another building material; it’s a revolutionary aluminum solution with a zinc surface that beautifully merges form with function. Its lightweight nature significantly reduces structural load, making it an ideal choice for a wide range of applications.

Click here and get your samples for free to see whats possible!

Get your free samples now!


  • ←
  • News
  • Downloads
  • Contact
  • Sustainability