• Link to LinkedIn
  • Link to Instagram
  • Link to Youtube
  • mail@kalzip.com
  • German
  • English
  • English (US-CA)
  • Deutsch Deutsch German de
  • English English English en
  • English (US-CA) English (US-CA) English (US-CA) us
  • Français Français French fr
  • Italiano Italiano Italian it
  • Español Español Spanish es
  • Русский Русский Russian ru
Tel.: +44 (0) 1942 295500
Kalzip GmbH
  • Inspiration
  • About us
    • Kalzip GmbH
    • History
    • Management
    • Kalzip Career
    • News
  • Roof systems
    • Our roof systems

      • Liner Deck Roof System
      • Deck roof system
      • Energy-saving roof
      • Vented Roof Systems
      • Roof refurbishment
      • Solar roof
      • Nature roof system
      • Overclad roofing systems
      • Complex geometry roof system
      • Standing seam roof

      • Aluminium profiles
      • Downloads
      • Roof system accessories
      • Solar roof accessories
  • Facade systems
    • Our façade systems

      • Sheet metal façade
      • Profiled façade
      • Standing seam façade
      • Rainscreen façade
      • Ball Proof façade
      • Facade Refurbishment

      • Aluminium façade profiles
      • Downloads
      • Façade system accessories
      • Façade Design
  • References
    • Product references

      • Roof System
      • Facade System
      • Foldable Aluminium
      • Construction type

      • New Construction
      • Refurbishment

      • 55 Years Book
    • Building Type

      • Education & Healthcare
      • Energy
      • Commercial & Industrial
      • Public offices and buildings
      • Sport & Leisure
      • Transport
      • Residentials
    • Kalzip Stories

      • Lighthouse
      • Kalzip and the Louisiana Superdome – Reimagining an icon
      • Santiago Bernabéu-Stadion
      • UN-Climate Conference 2021
      • The Chernobyl Story
      • Sports venues
  • Sustainability
  • Downloads
  • Service
    • Kalzip installer
    • NBS Specifications
    • FAQ
    • Approvals
    • Certificates
    • Site production
  • Contact
  • Click to open the search input field Click to open the search input field Search
  • Menu Menu
  • Deutsche Version
  • US Version
  • Version française
  • Versione italiana
  • Русская версия
  • Home
  • About us
    • Kalzip GmbH
    • History
    • Sustainability
    • Donges Group
    • Management
    • Kalzip Career
  • Roof systems
    • Liner Deck Roof System
    • Deck roof system
    • Energy-saving roof
    • Vented Roof Systems
    • Roof refurbishment
    • Solar roof
    • Nature roof system
    • Overclad roofing systems
    • Complex geometry roof system
    • Standing seam roof
    • Aluminium profiles
    • Roof system accessories
  • Façade systems
    • Sheet metal façade
    • Profiled façade
    • Standing seam façade
    • Rainscreen façade
  • References
    • Product references
      • Roof structures
      • Facade systems
      • Foldable Aluminium
    • Construction type
      • New construction
      • Refurbishment
    • Building type
      • Education & Healthcare
      • Energy
      • Commercial & Industry
      • Public offices and buildings
      • Sport & Leisure
      • Transport
      • Residentials
    • Kalzip Stories
      • Santiago Bernabéu-Stadion
      • UN-Climate Conference 2021
      • The Chernobyl Story
      • Sports venues
  • Downloads
  • Service
  • Contact
    • +44 (0) 1942 295500
    • mail@kalzip.com
    • Our contacs
    • Privacy policy
    • Disclaimer

Construction Site of the week

Hill University

Edge Hill University in Lancashire, England, is a public university with a campus in Ormskirk. The institution consists of three faculties: Arts and Science, Education and Health and Social Care.

New buildings are currently being constructed on the campus: Plans include additional student accommodation and a new science building that will house state-of-the-art research facilities. The new residences will offer modern amenities and feature a green courtyard with gardens and social spaces for students.

These meeting spaces encourage social interaction and create a communal atmosphere. Both the ‘on campus’ student residences and the new science building will have a Kalzip roof – in keeping with the existing buildings on campus – which contributes to architectural consistency and is known for its durability and energy efficiency. This reflects the university’s commitment to sustainable construction and ecological awareness.

Thoughtfully considered. KALZIP.

Contact

Kalzip GmbH
Yannick de Beauregard
Kalzip Marketing
August-Horch-Str. 20 – 22
56070 Koblenz

Phone: +49 261 9834 0
Fax: +49 261 9834 100

E-Mail: yannick.de-beauregard@kalzip.com

Search

Search Search
  • Highlight of the month – Kelloggs Silohotel12. November 2025 - 11:30 am
  • TeamKal Event 202520. October 2025 - 9:06 am
  • Highlight of the Month – Ardgowan Distillery13. October 2025 - 9:18 am
  • Construction site of the week – sewage treatment plant, Bayreuth, Germany30. September 2025 - 7:55 am
  • Construction site of the week – New lecture theatre building EBS University, Oestrich-Winkel22. September 2025 - 11:36 am
  • Highlight of the Month: Intercambiador de Valdebebas17. September 2025 - 7:44 am
  • Construction site of the week – Gymnasium in Vechelde12. September 2025 - 12:26 pm
  • Construction site of the week – Tranvia di Bologna, Italy5. September 2025 - 12:08 pm
  • Construction site of the week – Daycare center, Hagen22. August 2025 - 11:53 am
  • Kalzip at eps ARENA SUMMIT 2025 in Frankfurt19. August 2025 - 9:57 am

About us

Über uns

  • About Kalzip
  • History
  • Donges Group
  • Management
  • Career

Products

Produktpalette

  • Products
  • Roof systems
  • Façade systems

Downloads

Downloads

  • Downloads
  • NBS Specifications

Contact

Kontakt

  • Make an enquiry
  • Find an area sales manager
  • International contacts
  • Directions to Kalzip

Copyright © 2025 | Kalzip® GmbH
  • Link to LinkedIn
  • Link to Instagram
  • Link to Youtube
  • Terms and conditions
  • Disclaimer
  • Privacy policy
Link to: New content for the Gasometer Berlin Link to: New content for the Gasometer Berlin New content for the Gasometer Berlin Link to: Construction Site of the Week: LAX Train Station, Los Angeles, USA Link to: Construction Site of the Week: LAX Train Station, Los Angeles, USA Construction Site of the Week: LAX Train Station, Los Angeles, USA
Scroll to top Scroll to top Scroll to top
Privacy & Cookies
We are using cookies to give you the best possible experience on our website. Some of them are essential to display the website, while others help us to improve this website and your experience. You can consent to the use of cookies (except for functional cookies), your consent is voluntary and can be withdrawn at any time with future effect. For more information, please see our privacy policy.
Individual settings Accept allReject all
Cookies

Data protection overview

We are using cookies to give you the best possible experience on our website. Some of them are essential to display the website, while others help us to improve this website and your experience. You can consent to the use of cookies (except for functional cookies), your consent is voluntary and can be withdrawn at any time with future effect. For more information, please see our privacy policy or the imprint.
Functional
Always Enabled

Functional cookies are absolutely necessary for the proper functioning of the website. This category only includes cookies that ensure basic functionalities and security features of the website. These cookies do not store any personal information.

Statistics

Statistical cookies are used to understand how visitors interact with the website. These cookies help provide information about metrics such as number of visitors, bounce rate, source of traffic, etc.

Marketing

Marketing cookies are used to provide visitors with relevant ads and marketing campaigns. These cookies track visitors across websites and collect information to provide customised ads.

Save & Accept

Year-end dates / Koblenz plant (Germany)

End of production:
December 12, 2025

Last return of goods:
by December 13, 2025

Last shipment:
December 15, 2025

Company holidays:
December 22, 2025 through January 2, 2026

Resumption of production/shipping:
January 5, 2026

”

Kalzip wishes you a Merry Christmas and a Happy New Year.

  • ←
  • News
  • Downloads
  • Contact
  • Sustainability
  • Career